pvc chair leather chair chrome chair DC002 - DC002
Type: Bar Furniture | Specific Use: Bar Chair | General Use: Commercial Furniture | Material: Glass,Leather |
Appearance: Modern | Folded: No | Size: 500*410*980 | Place of Origin: Hebei China (Mainland) |
Brand Name: Ruilong | Model Number: DC002 | Color: Black or as customer like | Frame: Chrome Base |
Packing: 4pcs/ctn | Volume(cbm): 0.09 | G.W.(kg): 19 | Qty/ 20 container: 311 pcs |
Outside package: 5 layer brown carton | Inside package: transparent plastic bag + foam |
pvc chair leather chair chrome chair DC002
Item No. | DC002 |
Size (mm) | 500*410*980 |
Description | Soft leather chrome tube Oval tube, 15*30*2mm |
Volume(cbm) | 0.09 |
Packing | 4pcs/ctn |
G.W.(kg) | 19 |
Qty/ 20 container | 311 pcs |
Service:
1.Designing the assemble instruction and shipping marks.
2.Providing the professional Inspection Report.
3.OEM(We can produce as your requirement)
4.Reduce profit to help clients selling promotion in special situation.
Company Profiles:
1.Ruilong furniture is a professional manufacturer of dining chair. we can also make tv stand, coffee table, side table, and dining table
2.We have over 6 years experience in designing, developing and managing, we guarantee all products up to the specified quality.
3.Our factory has more than 8,000 square meter workshop, over 60 skilled workers and technicians.
4.Our conception is “deliver our most competitive products to the most valuable market, in order to work with our client to got the best profit.”
Terms and Conditions:
1.Trade Terms: FOB, CIF, EXW
2.Payment Terms: T/T, L/C,Western Union, PayPal, Escrow, Money Gram
3.Payment Condition: 30% deposit in advance, 70% balance after delivery
4.Delivery Time:25-35 days after deposit (If T/T)
5.Packing: 1)Usual packed in 2pcs/1ctn; 4pcs/2ctns; 6pcs/2ctns 2)Frame Package: with styrofoam paper; Hardwares in poly bags; 3)Carton: 5-layer cardboard carton 6.Shipping: By sea, by air and by express delivery
Welcome to visit our company!
Packaging Detail:1)Seat Packaging:5-layer cartons; 2) Frame packaging: base wrapped with CGPE bags; Hardware in polybags; 3) Carton: 5-layer cardboard carton following "Stacking Test and Master Carton Drop Test |
Delivery Detail:20-35 days after received deposit |