High Class Modern Hotel Chair CY-8030 - CY-8030 Hotel Chair
Hotel Chair, 1.direct manufacture with top quality, 2.Aluminium or steel frame, 3.good price,good fabric,good paint - details see: https://www.furniturepopular.com/high-class-modern-hotel-chair-cy-8030-10019830
Type: Hotel Furniture,hotel chair | Specific Use: Hotel Chair | General Use: Commercial Furniture | Material: Metal,aluminum and iron |
Metal Type: Iron | Appearance: Modern | Folded: No | Size: 450W*520D*460SH*920H,45W*52D*46SH*92H CM |
Place of Origin: Guangdong China (Mainland) | Brand Name: Top Furniture Hotel Chair | Model Number: CY-8030 Hotel Chair | painting and fabric colors: many colors available |
painting: Oven painting or powder coated | N.W: 6KG for iron tube | loading: 1600pcs for 40HQ | CBM: 0.0425 |
packing: 17-18pcs in a package | delivery: 20-25days |
Hotel Chair
High Class Modern Hotel Chair CY-8030 | |
product name | Hotel Chair |
item number | CY-8030 |
size(cm) | 45W*52D*46SH*92H |
material | 1. 25*25*2.0mm aluminum tube / 25*25*2.mm iron tube |
2.high grade fabric, many colors available | |
3.high density sponge .the density more than national standard | |
4. good painting (oven painting).through nine procedure. not easy fade , and many color available.(Oil painting, powder coating, imitation wood finish, plating are for your choice) | |
Tube Shapes | square,cone,rectangular,round,rhombic... |
Upholstery | Fabric(linen,lint,PVC,PU... and waterproof and fire-proof are available as request) |
Fire-proof standard | BS 5852 or CA 117 is available as request |
weight | 5.5kg/pcs(25mm aluminum tube); 6kg/pcs(25mmiron tube) |
volume | 0.0425m3(17pcs in a package for 40HQ container);0.045m3(13pcs in a package for 20ft container) |
Package | 17pcs in a package for 40HQ container;13pcs in a package for 20ft container; Plastic bag and bubble bag,then non-woven fabric |
Price | FOB Shenzhen price for a container,EXW price for LCL,CIF destination price for a container and LCL. |
Payment | T/T,Western Union:30%deposit before production,70% balance before loading container |
Export port | Shenzhen port |
lead time | 25days for 40HQ,20days for 20ft |
Functions | meeting room, hotel, banquet ,restaurant , dining room ,etc. |
After-sales service | 1. our products’ maintenance period is one year on welding and internal structure. |
2. if there are some problem with our product in two years, we will repair it in 5-7days after the product arrived at our factory. | |
Remark | 1.The above-mentioned parameters are subject to actual date |
2.we can change some of the parameter according to the clients requirements 3.We could design as you want |
Product details
Certificates
Our team and fairs
Feel free to contact me
Packaging Detail:600pcs for 20GP 1400pcs for 40GP 1600pcs for 40HQ for Hotel Chair |
Delivery Detail:25 days after receiving deposit for Hotel Chair |